Workers Building Chiller Fan Coil System Design, Dhahran

Dhahran, Saudi Arabia

Case Summary

Carrier HAP load analysis and 2-pipe fan coil system sizing for a 1,715 m² workers accommodation building in Dhahran, Saudi Arabia. 142.9 kW peak coil load with ASHRAE 62.1 ventilation sizing.

Client Confidentiality

Due to client NDA commitments, the showcased projects represent only a portion of our work and not the full scope of what we've delivered.

Workers Building Chiller Fan Coil System Design, Dhahran

A workers' accommodation building in Dhahran, Saudi Arabia, a 1,715 m² single-floor plan serving 50 occupants, was analysed by Fluxiss using Carrier HAP with a 2-Pipe Fan Coil terminal unit system. The design location in the Jubail area brings punishing summer conditions, with peak cooling governed by September 15:00 outdoor air at 42.8°C DB / 21.1°C WB and peak zone cooling at October 15:00.

The Analysis

  • Carrier HAP load model with 2-Pipe Fan Coil (2P-FC) terminal unit system
  • Peak cooling identified at September 15:00; peak zone cooling at October 15:00
  • Ventilation outdoor air sized per ASHRAE 62.1 at 2.5 L/s per person plus 0.30 L/s per m²

Key Results

  • Total coil cooling load at September peak: 142.9 kW, of which 142.3 kW sensible
  • Heating load: 26.1 kW at the design heating day (7.2°C outdoor air)
  • Supply airflow: 11,616 L/s
  • Outdoor air ventilation: 640 L/s
  • Chilled water coil sized at 6.16 L/s flow at a 5.6°K rise

The load analysis confirmed a chiller-based 2-pipe fan coil system as the appropriate solution for this climatic zone, and gave the client documented, zone-level numbers to procure against.